MSI Surfaces LVP - Blonde Flaxen
SKU: VTRFLAXEN9X48-8MM-22MIL
Size: 9x48
Transform your space with the Flaxen Luxury Vinyl Planks by MSI Surfaces. This standard-tier flooring offers a blend of style and durability, perfect for enhancing any room with its blonde elegance.
Key Highlights
- Premium design enhances any room's aesthetic
- Versatile application for multiple spaces
- Easy maintenance for lasting beauty
Technical Specifications
Basic Information
- Brand:MSI Surfaces
- Wear Layer: 22MIL
- Plank Width: 9x48
- Room Compatibility: Bedroom, Dining Room, Hallway, Kitchen, Living Room, Office
Visual Characteristics
- Grain Pattern: Minimal, clean, subtle
- Texture: Smooth, consistent
- Finish Look: Matte, low sheen
Style & Design
Color & Design
- Color Family: Woods
- Tone: Warm
- Variant: Blonde
Complements Well With:
Contemporary
Coastal
Design Pairings
Recommended Wall Colors
Soft greys
Creamy whites
Neutral beiges
Furniture Styles
Sleek modern furniture
Transitional pieces
Durability & Performance
Score: 9/10 -
Premium
Key Features
- 22MIL wear layer
- Stone Plastic Composite (SPC) construction
- Suitable for high-traffic residential and light commercial areas
Performance Details
- Wear Resistance: 9/10
- Traffic Rating: High
- Refinishing: 0 time(s)
- Refinishing Complexity: N/A
Installation Guide
Installation Methods
Floating
Suitable for subfloors in good condition. Use an appropriate underlayment, allowing for a 1/4 inch expansion gap around walls. Do not exceed room dimensions of 30x30 feet.
Glue Down
Ideal for high-moisture environments. Use a water-resistant adhesive, with a trowel size as specified by the adhesive manufacturer. Allow 24 hours cure time before foot traffic.
Nail Down
Recommended for wooden subfloors. Use 1-1/2 inch nails with a pneumatic nailer set to 70-90 psi. Space fasteners 8-10 inches apart.
Site Requirements
- Temperature: Ensure the room temperature is maintained between 65°F and 85°F for a minimum of 48 hours before, during, and after installation.
- Humidity: Keep relative humidity levels between 30% and 50% throughout the installation process.
- Preparation: Operate HVAC systems for at least 5 days prior to installation to stabilize room conditions. Ensure all windows and doors are installed and closed to prevent drafts. Provide adequate lighting to ensure accurate installation.
Required Tools
Essential Tools:
Table saw, miter saw, tape measure, utility knife, safety goggles, knee pads
Optional Tools:
Moisture meter, rubber mallet, pull bar, tapping block
Maintenance Guide
Routine Care
- Daily: Sweep or vacuum with a soft brush attachment to remove surface dust and debris.
- Weekly: Damp mop using a vinyl-approved cleaner, following the manufacturer's dilution and application instructions.
- Monthly: Conduct a detailed inspection for wear or damage and perform spot cleaning as needed with a gentle, non-abrasive cleaner.
Cleaning Products
Recommended:
pH-neutral floor cleaners specifically designed for vinyl
Products to Avoid:
Abrasive cleaners, wax polishes, ammonia-based products















Projects
Reviews
There are no reviews yet.