MSI Surfaces LVP - Blonde
SKU: VTRSHAGRO9X48-8MM-22MIL
Size: 9x48
Transform your space with MSI Surfaces' Shasta Grove Luxury Vinyl Planks. This flooring solution meets your need for style and durability, featuring a captivating blonde hue that enhances any room.
Key Highlights
- Premium design enhances any room's aesthetic
- Versatile application for multiple spaces
- Easy maintenance for lasting beauty
Can’t find what you’re looking for? Contact us—we may have it in stock.
Call Now : (718) 252-6177Technical Specifications
Basic Information
- Brand:MSI Surfaces
- Wear Layer: 22MIL
- Plank Width: 9x48
- Room Compatibility: Bedroom, Dining Room, Hallway, Kitchen, Living Room, Office
Visual Characteristics
- Grain Pattern: Minimal to subtle variation
- Texture: Smooth, consistent
- Finish Look: Matte to low sheen
Style & Design
Color & Design
- Color Family: Blonde wood tones
- Tone: Warm
- Variant: Subtle variation with a clean appearance
Complements Well With:
Open concept spaces
Informal family areas
Design Pairings
Recommended Wall Colors
Soft neutrals
Light greys
Warm whites
Furniture Styles
Modern
Transitional
Coastal
Durability & Performance
Score: 9/10 -
Premium Commercial Use
Key Features
- Premium Wear Layer
- Superior Stability
- Excellent Moisture Resistance
Performance Details
- Wear Resistance: 9/10
- Traffic Rating: Heavy Duty
- Refinishing: 0 time(s)
- Refinishing Complexity: High
Installation Guide
Installation Methods
Floating
Ideal for rooms with moderate foot traffic. Use a recommended underlayment and leave a 1/4 inch gap for expansion. Suitable for rooms up to 30x30 feet.
Glue Down
Best for high-traffic areas or commercial settings. Use an approved vinyl adhesive and follow the specified trowel size. Allow 24 hours for the adhesive to cure.
Nail Down
Not recommended for luxury vinyl planks due to potential damage. Consider using alternative methods like floating or glue-down.
Site Requirements
- Temperature: The room should be maintained between 65-85°F for at least 48 hours before, during, and after installation.
- Humidity: Keep relative humidity between 30-50% to ensure the longevity of the vinyl planks.
- Preparation: Ensure the HVAC system is operational at least 72 hours prior to installation. Keep windows and doors closed to maintain consistent environmental conditions.
Required Tools
Essential Tools:
Utility knife
Tape measure
Straightedge
Level
Rubber mallet
Optional Tools:
Pull bar
Spacers
Floor roller
Maintenance Guide
Routine Care
- Daily: Sweep or vacuum with a soft-bristle attachment to remove dirt and debris.
- Weekly: Damp mop with a pH-neutral cleaner. Avoid using excessive water.
- Monthly: Inspect for any signs of wear or damage, and perform a thorough cleaning.
Cleaning Products
Recommended:
pH-neutral floor cleaner
Vinyl-specific cleaning solutions
Products to Avoid:
Abrasive cleaners
Wax or oil-based products










Projects
Reviews
There are no reviews yet.