Terra Legno Simple Beach Sand - 6" Thickness 9/16"
SKU: PEWOBS - N312X24.86
Size: 6"
Elevate your home with the natural beauty of BEACH SAND by Terra Legno. This engineered hardwood flooring combines aesthetic appeal with functional versatility, making it an ideal choice for any room. The subtle tones and textures bring a sense of calm and sophistication to your interiors.
Key Highlights
- Natural tones and textures create a serene atmosphere.
- Perfect for living rooms, kitchens, and bedrooms.
- Easy to maintain, ensuring long-lasting beauty.
Experience the warmth and charm of this flooring, designed to harmonize with various décors. Its engineered construction ensures stability and ease of installation, providing a seamless look that enhances your home's aesthetic.
Key Highlights
- Natural tones and textures create a serene atmosphere.
- Perfect for living rooms, kitchens, and bedrooms.
- Easy to maintain, ensuring long-lasting beauty.
Can’t find what you’re looking for? Contact us—we may have it in stock.
Call Now : (718) 252-6177Technical Specifications
Basic Information
- Brand:Terra Legno
- Thickness: 9/16"
- Wear Layer: 3mm Saw Cut
- Plank Width: 6"
- Room Compatibility: Bedroom, Dining Room, Hallway, Living Room, Office
Visual Characteristics
- Grain Pattern: Light, airy, subtle grain with a natural appearance
- Texture: Smooth with a soft tactile feel
- Finish Look: Matte or natural, enhancing the warm, beachy aesthetic
Style & Design
Color & Design
- Color Family: Woods
- Tone: Warm
- Variant: Natural, sun-bleached appearance
Complements Well With:
Design Pairings
Recommended Wall Colors
Furniture Styles
Installation Guide
Installation Methods
Floating
Suitable for rooms where subfloor cannot be altered. Use a foam underlayment and leave a 1/4 inch expansion gap around the perimeter.
Glue Down
Ideal for concrete subfloors. Use a moisture barrier adhesive and follow manufacturer trowel recommendations. Allow 24-48 hours for curing.
Nail Down
Best for wooden subfloors. Use 1-1/2 inch flooring nails or staples with pneumatic nailer set at 80-100 PSI. Space fasteners every 8-10 inches.
Site Requirements
- Temperature: Ensure the room temperature is maintained between 60°F and 80°F for at least 48 hours before, during, and after installation.
- Humidity: Keep relative humidity between 30% and 50% to prevent floor warping or gaps.
- Preparation: Ensure HVAC systems are operational for at least 7 days prior to installation. Natural light should be sufficient for visibility, and all doors and windows should be closed to stabilize conditions.
Required Tools
Essential Tools:
Optional Tools:
Maintenance Guide
Routine Care
- Daily: Sweep or vacuum using a soft bristle attachment to remove dirt and debris.
- Weekly: Damp mop with a microfiber mop using a hardwood floor cleaner.
- Monthly: Inspect for scratches or damage and apply a wood floor polish if needed.






Projects
Reviews
There are no reviews yet.