Villa Bella Engineered Scipione - Scipione Wirebrushed
SKU: MCKZ025
Size: 8" wide and 72"
Transform your living space with Villa Bella's Scipione Solid Hardwood Flooring. Its wire brushed texture meets your need for elegance and durability, making it ideal for any room.
Key Highlights
- Premium design enhances any room's aesthetic
- Versatile application for multiple spaces
- Easy maintenance for lasting beauty
Technical Specifications
Basic Information
- Brand:Villa Bella
- Plank Width: 8" wide and 72"
- Room Compatibility: Bedroom, Dining Room, Hallway, Living Room, Office
Visual Characteristics
- Grain Pattern: Wire brushed, natural variation
- Texture: Moderate, pleasant tactile feel
- Finish Look: Low-luster, soft sheen
Style & Design
Color & Design
- Color Family: Warm woods
- Tone: Neutral
- Variant: Subtle, balanced undertones
Complements Well With:
Vintage accessories
Sleek modern elements
Design Pairings
Recommended Wall Colors
Warm neutrals
Soft whites
Muted earthy tones
Furniture Styles
Traditional
Modern
Rustic
Durability & Performance
Score: 8/10 -
High Residential Durability
Key Features
- Solid Hardwood with High Density
- Wire Brushed Surface for Increased Wear Resistance
- Full Refinishing Potential
Performance Details
- Wear Resistance: 8/10
- Traffic Rating: High
- Refinishing: 4 time(s)
- Refinishing Complexity: High
Installation Guide
Installation Methods
Floating
Use this method for areas with slight subfloor imperfections. Ensure a vapor barrier underlayment is installed and leave a 1/4 inch gap for expansion.
Glue Down
Ideal for cement subfloors. Use a high-quality adhesive and a notched trowel to apply. Follow manufacturer's guidelines for working and cure times.
Nail Down
Recommended for wooden subfloors. Use flooring nails or staples at a 6-8 inch spacing. Set your compressor to 75-85 psi for optimal results.
Site Requirements
- Temperature: The room should be kept between 60-80°F for 48 hours before installation to ensure optimal conditions.
- Humidity: Maintain a humidity level of 30-50% to prevent wood expansion or contraction.
- Preparation: Ensure the HVAC system is operational at least 72 hours prior to installation, and keep doors and windows closed to stabilize conditions.
Required Tools
Essential Tools:
Hammer, tape measure, level, and saw
Optional Tools:
Flooring nailer, moisture meter, and knee pads
Maintenance Guide
Routine Care
- Daily: Sweep or vacuum using a hardwood floor attachment to remove dust and debris.
- Weekly: Damp mop with a hardwood floor cleaner. Avoid using excessive water.
- Monthly: Inspect for scratches or damage and apply a hardwood floor polish if needed to maintain luster.
Cleaning Products
Recommended:
pH-neutral hardwood floor cleaner
Products to Avoid:
Ammonia-based cleaners, wax, or oil soaps


Projects
Reviews
There are no reviews yet.