Bruce LVT Elm - Gila Park 6-1/2"
SKU: # 1LP02
Size: 6-1/2" x 48"
Key Highlights
- Natural Elm design adds warmth and sophistication.
- Versatile for any room, from kitchens to living areas.
- Low-maintenance surface for easy cleaning and care.
This LVT not only enhances your decor but also offers the flexibility to suit various applications, ensuring your floors remain a timeless feature in your home.
Key Highlights
- Natural Elm design adds warmth and sophistication.
- Versatile for any room, from kitchens to living areas.
- Low-maintenance surface for easy cleaning and care.
Technical Specifications
Basic Information
- Brand:Bruce
- Thickness: .075"
- Plank Width: 6-1/2" x 48"
- Room Compatibility: Bedroom, Dining Room, Living Room, Office
Visual Characteristics
- Grain Pattern: Subtle variation with a natural appearance
- Texture: Moderate, pleasant tactile feel
- Finish Look: Low-luster, soft sheen
Style & Design
Color & Design
- Color Family: Brown
- Tone: Warm
- Variant: Rich, natural wood tones
Complements Well With:
Design Pairings
Recommended Wall Colors
Furniture Styles
Durability & Performance
Key Features
- Heavy wear layer
- SPC core
Performance Details
- Wear Resistance: 6/10
- Traffic Rating: Medium
- Refinishing: 0 time(s)
- Refinishing Complexity: Low
Installation Guide
Installation Methods
Floating
Use this method when you want easy installation and removal. Ensure an underlayment is used, leave a 1/4 inch expansion gap around the perimeter, and follow the interlocking mechanism.
Glue Down
Choose this for more permanent installations. Apply adhesive evenly using a trowel, allow proper working and curing time, and use a moisture barrier if needed.
Nail Down
Use on wood subfloors. Secure planks with nails or staples, maintaining 6-8 inch spacing between fasteners and adjust air pressure to avoid damaging the flooring.
Site Requirements
- Temperature: Maintain a temperature between 65°F and 85°F for at least 48 hours before, during, and after installation.
- Humidity: Ensure the relative humidity is between 30% and 50%.
- Preparation: Operate HVAC systems for at least 7 days before installation to stabilize the environment. Ensure all windows and doors are installed and closed to maintain conditions.
Required Tools
Essential Tools:
Optional Tools:
Maintenance Guide
Routine Care
- Daily: Sweep or vacuum with a soft brush to remove dirt and debris.
- Weekly: Damp mop with a non-abrasive cleaner designed for vinyl floors.
- Monthly: Perform a deep clean using a manufacturer-recommended cleaner and check for any damage or wear.
Reviews
There are no reviews yet.