Armstrong SPC LVT - Pina Colada
SKU: ST510
Size: 152.4 mm x 914.4 mm x 2.5 mm
Elevate your home with Armstrong Flooring's Mixer 2 Pina Colada LVT. This stylish flooring solution meets your need for elegance and practicality, making it an ideal choice for any room.
Key Highlights
- Premium design enhances any room's aesthetic
- Versatile application for multiple spaces
- Easy maintenance for lasting beauty
Technical Specifications
Basic Information
- Brand:Armstrong Flooring
- Plank Width: 152.4 mm x 914.4 mm x 2.5 mm
- Room Compatibility: Bedroom, Dining Room, Hallway, Living Room, Office
Visual Characteristics
- Grain Pattern: Subtle, minimal grain, mimicking tropical wood
- Texture: Smooth, consistent surface
- Finish Look: Low-sheen, easy maintenance
Style & Design
Color & Design
- Color Family: Woods
- Tone: Warm
- Variant: Pina Colada, light sandy beige
Complements Well With:
Light fabrics
Natural fibers
Vintage accessories
Design Pairings
Recommended Wall Colors
Soft whites
Light greys
Warm neutrals
Furniture Styles
Casual, relaxed furnishings
Rustic elements
Sleek modern pieces
Durability & Performance
Score: 7/10 -
Excellent
Key Features
- SPC core for superior stability
- Resilient surface engineered for wear resistance
- Low maintenance
Performance Details
- Wear Resistance: 8/10
- Traffic Rating: High
- Refinishing: 0 time(s)
- Refinishing Complexity: N/A
Installation Guide
Installation Methods
Floating
Use for areas where subfloor imperfections exist; install underlayment, leave a 1/4 inch gap for expansion, and ensure room dimensions do not exceed 30 feet in either direction.
Glue Down
Ideal for concrete subfloors; use recommended adhesive with a specified trowel, and allow 24 hours for curing.
Nail Down
Best for wood subfloors; use 1-1/2 inch cleats with a pneumatic nailer, spaced every 8 inches.
Site Requirements
- Temperature: Maintain a room temperature between 65°F and 85°F for at least 48 hours before and during installation.
- Humidity: Keep relative humidity between 30% and 60%.
- Preparation: Ensure the HVAC system is operational for at least 72 hours prior to installation, maintain normal lighting conditions, and make sure all windows and doors are installed.
Required Tools
Essential Tools:
Circular saw
Tape measure
Utility knife
Safety goggles
Optional Tools:
Moisture meter
Flooring roller
Knee pads
Maintenance Guide
Routine Care
- Daily: Sweep or vacuum the floor to remove dirt and prevent scratches.
- Weekly: Use a damp mop with a pH-neutral cleaner designed for vinyl flooring.
- Monthly: Perform a thorough cleaning using a microfiber mop and a deep cleaner suitable for LVT.
Cleaning Products
Recommended:
Bona Hard-Surface Floor Cleaner
Products to Avoid:
Abrasive cleaners
Wax or polish products







Projects
Reviews
There are no reviews yet.